Land, title, and rights for projects that move power

Energy infrastructure land services

Site selection, title research, leasing, and right-of-way for battery storage, power generation, transmission, and large-load facilities.

Modern energy projects start with land and the rights to use it. We support developers, operators, and property owners with candidate-site research, ownership review, leasing, and right-of-way services. From a single equipment site to a multi-tract development, connect the proposed footprint to recorded title, identify parties whose agreement may be needed, and organize land questions into a practical path forward.

Land-side screening only. A line or substation nearby does not prove capacity or interconnection availability.

Lead offering / BESS

Find land that fits. Know what rights it carries.

Battery storage site selection is more than finding acreage near electrical infrastructure. The land-side work is to understand the parcel, the parties, and the recorded rights before those questions become avoidable development friction.

Read about battery storage site selection

Site and ownership

Candidate tract review, ownership research, parcel and acreage references, and an organized view of who may need to grant rights.

Recorded constraints

Access, easements, restrictions, leases, reservations, and mineral or surface conflicts visible in the records reviewed.

Site control and growth

Support for option and lease terms, equipment footprints, access rights, expansion areas, and construction needs.

Landowner questions

A clearer view of the proposed rights, retained uses, restoration provisions, and commercial terms to discuss with advisers.

Two ways into the work

Built around the land question you need answered.

Developers and operators

Assemble the land picture.

Find candidate sites, establish ownership, support site control, and assemble the title and right-of-way records needed to advance a project. Initial work can identify recorded-rights issues, missing records, parties to contact, and questions to route to technical specialists.

Talk about developer support

Landowners and mineral owners

Understand what the proposal uses.

Review the proposed footprint and business terms, surface access and easements, existing mineral development, retained uses, future expansion, and restoration language. Get the record and commercial questions organized before taking them to legal or technical advisers.

Discuss a proposed lease

A record-backed screen

Useful first deliverables, with limits made clear.

Based on the agreed scope and records available, an initial screen can produce a tract and ownership schedule, a summary of reviewed recorded-rights issues, a list of missing records and unresolved ownership questions, and specialist questions for the next diligence phase.

01

Tract and ownership schedule

02

Recorded-rights issue summary

03

Missing records and open items

04

Questions for qualified specialists

Screening is not a guarantee of site viability, marketability, utility service, interconnection, or project approval. Grid proximity alone does not establish capacity. Engineering, environmental and fire-safety design, legal interpretation, utility studies, and permitting must be handled by qualified specialists and relevant authorities.

Infrastructure in scope

One land picture across connected project types.

01

Battery storage and solar-plus-storage

Standalone battery sites, storage near substations, and batteries added to new or existing solar projects. Land assembly, site control, title, mineral-owner research, access, and expansion rights.

02

Transmission, substations, and ROW

Transmission and generation tie lines, substations, switchyards, converter stations, collection corridors, and distribution upgrades. Route ownership schedules, easement research, and acquisition support.

03

Data centers and industrial power

Large-load campuses and powered-land concepts. Site assembly, recorded-use restrictions, access and utility corridors, existing mineral operations, water-rights questions for specialists, and phased expansion.

04

Geothermal and long-duration storage

Geothermal power or thermal projects, plus flow, thermal, compressed-air, pumped, and other long-duration storage concepts. Surface and subsurface ownership, access, water, and corridor questions vary by technology.

Additional land scopes

  • Wind development and repowering
  • Microgrids and industrial energy campuses
  • EV and heavy-truck charging depots
  • Dispatchable generation and fuel-cell sites

Related, not the same

Keep the supply chain distinct from grid storage.

Battery storage is a facility that stores and delivers electricity. Lithium brine and critical-mineral development serve the battery supply chain, with different mineral, subsurface, and competing-use questions. Hydrogen production and storage, carbon capture and storage, and fiber corridors are adjacent infrastructure topics, not interchangeable forms of grid storage.

For land support related to mineral development and renewable projects, see lithium and renewables. For route assembly and corridor work, visit right-of-way acquisition. Landowners can also review proposed lease review.

A virtual power plant aggregates distributed resources and may involve many underlying battery, generation, or charging sites rather than one large tract. The land work belongs at those physical locations.

Start with the land question

Tell me what the project needs to use, and where.

Share the project type, county or location, target footprint, timeline, and whether you represent a project team or own land. Do not send sensitive documents through an unsecured contact form.

Contact Ryan

Common questions

Before the project moves forward

What does energy infrastructure land support include?

Depending on the agreed scope, support may include candidate-parcel research, ownership and title review, tract schedules, lease and option support, right-of-way acquisition support, access and easement research, and a summary of recorded issues and open questions.

Does a site near a power line or substation have available capacity?

No. Proximity to a transmission line or substation does not establish available capacity, an interconnection path, or an approved service arrangement. Electrical feasibility and interconnection must be evaluated by qualified power-system specialists.

What are the initial deliverables for a site screen?

An initial, agreed screen can organize candidate tracts and known ownership, summarize reviewed recorded rights and potential conflicts, identify missing records, and list questions for engineering, environmental, fire-safety, legal, utility, and permitting specialists. It does not guarantee site viability.

Can you help a landowner review a proposed battery storage lease?

A land-side business review can help explain the proposed footprint, term, payment structure, access and easement provisions, expansion rights, restoration language, and effects on existing surface or mineral uses. Legal interpretation, drafting, and advice should come from an attorney.

How are battery storage projects different from lithium projects?

Battery energy storage is a grid or customer-side facility that stores and later delivers electricity. Lithium brine and critical-mineral projects are part of the battery supply chain and involve mineral or subsurface development. They are related but distinct land-service scopes.

Do you determine environmental, engineering, fire-safety, or permitting feasibility?

No. Land and recorded-rights research can inform those workstreams, but engineering, environmental assessment, fire-safety design, legal interpretation, utility studies, and permitting decisions belong to appropriately qualified specialists and authorities.